Central Tower is Melo Group's 824-residence rental tower at 46 NE 6th Street, the building first announced as Downtown 6. The floor plans are out: one- to three-bedroom homes from 732 to 1,171 sq ft, every one with a balcony and a full-size washer and dryer.
Get Pricing First See the Building46 NE 6th Street
Melo Group has published the layouts: one-bedrooms at 732 sq ft, one-bedroom-plus-dens at 792, two-bedroom, two-bath homes from 878 to 951, and three-bedrooms at 1,171. Every residence gets a balcony, granite counters, Samsung stainless appliances, a double-door refrigerator, wood-look laminate floors, porcelain-tiled baths and a full-size washer and dryer.
The tower stands on NE 6th Street across from 600 Miami Worldcenter, with the Metromover at the door, Bayside and Miami Dade College a block away, and I-95 and I-395 within reach. Brickell is a few blocks south; South Beach and Miami International Airport are each about ten minutes out.
Why this building
A large resort-style pool and a jacuzzi on site, so a Saturday in the sun doesn't start with a drive.
More than 2,100 sq ft of fitness space, plus a social room, kids' room, business center and a café-market in the building.
Private parking on site for the car, and the Metromover at the door for the days you'd rather leave it.
Central Tower pricing goes to this list before it reaches the listing sites.
Get Pricing FirstThe Neighborhood



FAQ
Yes. Downtown 6 was the project's announced name; Melo Group now markets the tower as Central Tower. Same building, same address: 46 NE 6th Street.
Melo Group lists completion for February 2027. Applications at Melo towers typically open around completion, and this list hears first.
One-bedrooms (732 sq ft), one-bedroom-plus-den (792 sq ft), two-bedroom, two-bath homes (878 to 951 sq ft) and three-bedroom, two-bath homes (1,171 sq ft). Melo's published plans don't include studios.
Melo hasn't published rents yet. When it does, the numbers and any opening specials go to this list before the listing sites.
A large swimming pool and jacuzzi, a fitness center of more than 2,100 sq ft, a café-market, social room, kids' room, business center and private parking on site.
First Access
Melo lists completion for February 2027, and applications usually open around then. Get the rents, opening specials and first pick of floor plans the day they're released.